top of page
![]() Stockyard Hill WindfarmClient : Sol Systems Pty Ltd (for Goldwind Australia) Location : Beaufort, Victoria March 2020 to present The Windfarm comprises 149 WTG's with rated a capacity of 550MW. Three 132/33kV Substations, Balance of Plant, STATCOMs and Harmonic Filters. Sol Systems completed the testing and commissioning of all primary and secondary plant and system. | ![]() Cape Lambert Power Station& 220kV CLBSS Substation Client : ABB & RCR (for Rio Tinto Iron Ore) Location : Western Australia June to December 2017 Expansion of RTIO's existing 220kV Cape Lambert substation to include two LM6000 PF SPRINT OCGT 65MVA Generator units. CLPS was connected to the RTIO network via two 220/11kV power transformers & 220kV GIS switchgear. ABB undertook the integration and modification of existing substation systems, acceptance testing and commissioning. | ![]() Electric Arc Furnace upgradeHV reticulation upgrades and SVC installation and Maintenance Client : InfraBuild Steel Location : Laverton North, Victoria 2009 to present Installation, commissioning, maintenance and operational support of +115MVar SVC. Protection and control system development to update existing scheme to digital protection with a focus on system reliability and improving information available to operators. 90 MVA EAF transformer upgrade and integration. 75 MVA Sydney Steel Mill EAF transformer |
---|---|---|
![]() Eastern Treatment Plant6.6kV 17H Influent Pump Station Switchboard replacement Client : John Holland (for Melbourne Water) Melbourne Victoria 2017 The HV switchboards for the pump station were being replaced with new ABB ZS1 equipment. Testing and commissioning, remote end protection design and integration in brownfield environment. | ![]() Rapid Earth Fault Current Limiter Upgrade (REFCL)Rapid Earth Fault Current Limiter Upgrade (REFCL) GridMec (for Powercor Australia) Victoria May 2018 to present As part of the REFCL program it was a requirement for HV customers were adequately protected from the newly installed Rapid Earth Fault Limiters. The solution involved 22/22kV isolation kiosks with a power transformer and associated protection and control schemes. EPT undertook design review co-ordination, Factory & Site Acceptance Testing & commissioning. | ![]() PLQ iPASS upgrade Braemar& Blackwall Factory Acceptance Testing ABB Australia (for Powerlink Queensland) Brisbane 2013 - 2014 The 275kV (Breaker and a half scheme) and 330kV (mesh configuration) Control Buildings were equiped to provide protection and control functionality in conjunction with iPASS primary equipment. Scheme testing and commissioning involved IEC61850-8-1 and 9-2LE with non conventional instrument transformers. |
![]() Windturbine ProjectIn 2014, AAB engaged EPT Services to assist with the establishment of new Windturbines in Brisbane, QLD Australia | ![]() Transformer Project Phase IIPhase II of the Transformer Project was successfully completed with the assistance of EPT Services in partnership with Utility X | ![]() Powerline ProjectIn 2015, EPT Services concluded their engagement with Company X after the successful establishment of new Powerlines in Adelaide, South Australia. |
---|---|---|
![]() Substation ProjectPowerlink engaged EPT Services to assist with new substation solutions. Work was successfully completed in November 2015, on site in Melbourne, Australia. | ![]() Concrete ProjectEPT Services successfully completed a comprehensive 2 year project from 2013-2014 to build a new substation in partnership with Vendor. | ![]() Metal ProjectEPT Services successfully executed the establishment of a new metal project for One Steel, Laverton Victoria, Australia. |
bottom of page